Graphic: Inside China AI
Gotion High-Tech: Volkswagen’s Chinese Battery Partner Builds Its European Footprint
Company profile · 26 November 2026.
Gotion High-Tech (国轩高科) is a battery maker from Hefei whose largest shareholder is Volkswagen. It has assembled battery products in Göttingen since 2023, the company says, and on 28 September 2026 it agreed with Volkswagen’s battery company PowerCo to form joint ventures for LFP cells in Spain and Slovakia. For Europe, Gotion matters less as an AI company than as part of the supply chain for cheaper electric cars and grid storage. It describes the AI it uses, in production and battery monitoring, only in general terms.
Origins and backing
Gotion was founded in 2006 and is headquartered in Hefei, Anhui; it is listed in Shenzhen under the code 002074 (Gotion Germany). Its chairman and general manager is Li Zhen, who is also its actual controller: together with his son Li Chen and Nanjing Guoxuan Holding he held 17.85 per cent of the shares at 30 June 2026 (half-year report 2026).
The largest single shareholder is Volkswagen (China) Investment Co., with 24.28 per cent at 30 September 2026 (third-quarter report 2026). Under a shareholder agreement from 2020, extended in December 2024 to 72 months, Volkswagen waives part of its voting rights so that its voting share stays at least five percentage points below that of the founding shareholders (half-year report). On 28 September 2026 Volkswagen China agreed to sell 5.30 per cent of Gotion to Hefei Construction Investment, a subsidiary of Hefei’s municipal construction investment group, for RMB 24.09 a share, or about RMB 2.32 billion; its stake would then fall to 18.98 per cent (Gotion filing, 29 September 2026). Hefei’s state-assets commission approved the purchase; according to Gotion’s filing of 6 November 2026, the stock exchange’s compliance confirmation and the share transfer were still outstanding (Gotion filing); by 27 November 2026 Gotion had published no notice that the transfer was completed. Volkswagen says it “will continue to hold a significant stake in Gotion” (Volkswagen Group).
What they build
Gotion makes LFP and NCM cathode materials, battery cells, battery packs for electric vehicles, battery management systems and energy storage systems, the company says (Gotion). Volkswagen calls it “both a cell supplier to the Volkswagen Group and a strategic partner of PowerCo” (Volkswagen Group); Gotion lists Volkswagen’s Unified Cell, in NCM and LFP versions, among its products (Gotion). Citing SNE Research, Gotion says it had 4.6 per cent of global EV battery installations in the first half of 2026, ranking fifth (half-year report). It also says its “Jinshi” all-solid-state battery exceeds 400 Wh/kg and is in pilot production (Gotion).
The AI angle is narrower than the headline products. In its half-year report, Gotion says its digital work focuses on “big data and artificial intelligence”: an industrial AI platform to balance yield, production efficiency and cost, and a big-data early-warning system that monitors vehicle and storage battery systems in real time. Its new “Qianyuan Zhichu 2.0” storage system embeds a “lightweight intelligent large model”, the company says, without naming or describing it (half-year report). The same report describes materials research, including its own lithium manganese iron phosphate and solid-state materials, without linking it to AI methods. Research and development spending was RMB 1.56 billion in the first half of 2026, up 12.8 per cent.
Key numbers
- Listing Shenzhen Stock Exchange, 002074; actual controller Li Zhen (17.85% with concert parties, 30 June 2026)
- Volkswagen 24.28% at 30 September 2026; agreed sale of 5.30% would reduce it to 18.98%
- Q3 2026 Revenue RMB 17.66bn (+74.6%); net loss attributable to shareholders RMB 537m; profit excluding non-recurring items RMB 145m (Q3 report)
- January–September 2026 Revenue RMB 45.44bn (+54.0%); net profit attributable RMB 849m (−66.5%)
- Why the Q3 loss Fair-value changes on shares the company holds and exchange-rate effects, Gotion says
- Overseas share RMB 9.48bn, or 34.1% of revenue, in H1 2026 (including Hong Kong, Macau and Taiwan)
- AI Industrial AI platform for production; big-data early warning for battery systems; an unnamed “large model” in a storage product (company descriptions)
The European angle
- Germany: production Gotion launched its first locally produced battery product in Göttingen on 16 September 2023, the company said (Gotion via PR Newswire); the trade publication pv magazine reported on 19 September 2023 that Gotion had “started making battery packs” at the former Bosch plant (pv magazine). Gotion Germany Battery GmbH describes Göttingen as one of its manufacturing sites with 27,000 m² of production space and says its products are “Assembled in Germany!” (Gotion Germany). On 23 October 2026 the group listed Göttingen among its production bases and said it was “operating steadily” (Gotion). Gotion has not published output volumes or named customers for Göttingen.
- Customers Gotion’s half-year report lists related-party sales in the first six months of 2026 of RMB 1.29 billion to PowerCo SE (development fees and cells), RMB 870 million to Škoda Auto (cells and battery packs) and RMB 14 million to Volkswagen AG, plus RMB 75 million in storage systems and cells to InoBat Europe in Slovakia (half-year report). The report does not say where these products were made.
- Spain: Valencia Under the agreement with Volkswagen and PowerCo, Gotion is to take 49 per cent of PowerCo’s Valencia company, which is to build 29.1 GWh a year of lithium battery capacity for about €2.26 billion; PowerCo keeps 51 per cent (Gotion filing, 29 September 2026). Volkswagen describes the gigafactory as “currently under construction” and wants it to become “a European production hub for Unified Cells based on LFP technology” (Volkswagen Group).
- Slovakia: Šurany A new Gotion company in Šurany is to build 8.4 GWh a year of lithium battery capacity for about €480 million, with Gotion holding 51 per cent and PowerCo 49 per cent (Gotion filing). Construction of a battery plant in Šurany by Gotion InoBat Batteries, a joint venture with the Slovak company InoBat, officially began on 28 October 2025; pilot production was then scheduled for September 2026 (Radio Slovakia International, 29 October 2025). The third joint venture, a cathode plant, is in Kenitra, Morocco.
- Status of the deal In total the three projects are to cost about €3.22 billion, of which Gotion’s side contributes about €1.60 billion. Gotion’s shareholders approved the investment on 20 October 2026 (Gotion filing); according to Gotion’s filing of 29 September 2026, the projects also need government approvals in China and abroad, and each has a construction period of up to five years (Gotion filing). By 27 November 2026 Gotion had not reported these approvals.
- Other entities Gotion GmbH, registered in Hanover and founded in 2019, is to hold the Slovak joint venture and, through a Moroccan subsidiary, the Moroccan one (Gotion filing). A UK subsidiary was set up in January 2026; its activities are not described (half-year report).
- United States The US National Defense Authorization Act for 2024 bars the Department of Defense from buying batteries produced by Gotion High-Tech and five other Chinese companies from 1 October 2027 (Public Law 118-31, section 154). This is a procurement restriction, not a sanction, and the Secretary of Defense may waive it. Gotion is not on the Pentagon’s “Chinese military companies” (1260H) list published in June 2026 (Federal Register). On 17 September 2025 the Michigan Strategic Fund notified Gotion’s US subsidiary that it was in default of a grant agreement for its planned battery project in Green Charter Township, citing no eligible activity at the site for more than 120 consecutive days and two pending lawsuits, suspended disbursements, and said it expected repayment of $23.67 million in Strategic Site Readiness Program funds if the default was not resolved within 30 days (Michigan Strategic Fund letter, published by Michigan News Source).
- What a European buyer would actually encounter Gotion cells in Volkswagen Group cars and Gotion storage systems assembled in Göttingen today, and, if the joint ventures go ahead, LFP cells from Valencia and Šurany made together with PowerCo.
What we could not verify
- Göttingen output: how many packs or storage systems the plant produces, and for whom.
- Šurany timing: whether pilot production started in September 2026 as planned in 2025, and how the new 8.4 GWh joint venture relates to the larger plan announced with InoBat.
- Valencia start of production and the outstanding government approvals for the three joint ventures.
- Completion of Volkswagen’s share sale, still pending on 6 November 2026; no completion notice by 27 November 2026.
- The outcome in Michigan after the default notice, and Gotion’s status on the US forced-labour (UFLPA) entity list, which we could not check in full.
- What the AI does: Gotion names no model, data volumes or results for its industrial AI platform or the “large model” in its storage system.
The open question for Europe: will Gotion’s European plants turn from Volkswagen projects into cell production that also serves other European customers, and will it say how much it already makes in Göttingen?


Comments are closed