Volant Aerotech: title card of the Inside China AI company profile

Graphic: Inside China AI

Volant Aerotech: Shanghai’s Passenger eVTOL Maker Aims for Certification in 2027

Auf Deutsch lesen →

Company profile · 28 November 2026.

Volant Aerotech (沃兰特) is a Shanghai company that designs electric aircraft which take off and land vertically and carry a pilot and five passengers. According to the company, its VE25-100 has been in China’s type-certification process since 2023 and has flown with a pilot on board; it is not yet certified. The company says it has more than 2,000 orders and letters of intent. Among the buyers it names is the German business-aviation operator DC Aviation. For Europe, Volant is less an AI story than a test case for China’s “low-altitude economy”: state-backed capital, a domestic certification path, and first export deals signed before the aircraft has a certificate.

Origins and backing

Volant was established in Shanghai in June 2021 (company timeline). Its founder and chief executive is Dong Ming. Mcfly Huang (黄小飞) is president and, according to the company, co-founder, and Zhang Baozhu is chief technology officer (Volant, Volant, 15 October 2026). The company says Dong previously worked at AVIC, General Electric and Rockwell Collins and on China’s ARJ21, C919 and CR929 airliner programmes. It describes its core team as coming from COMAC, Airbus and GE. The headquarters is in Shanghai’s Minhang district. Manufacturing and flight testing take place in Zigong in Sichuan, at a base the company says can produce 300 aircraft a year (Volant).

Funding has come in many small and mid-sized rounds. The company lists a seed round in July 2021 led by Shunwei Capital, with Ventech China, then several rounds in 2024 and a Series B in September 2025 with participation from SAIC Capital (Volant, 14 November 2025). In April 2026 it announced a Series C of more than $300 million, led by Stone, an investor from the United Arab Emirates, with HongShan and Fortera Capital. The company calls Stone its first investor from the Middle East (Volant, 27 April 2026, Yicai Global). On 27 May 2026 it announced a Series C+ of nearly RMB 1 billion. China Life’s technology fund led the round, joined by the Minhang district’s state investment platform, NIO Capital, CoStone Capital and the existing shareholder China Internet Investment Fund (Volant, 27 May 2026). In its release of 29 May 2026, the company put its total funding at “over RMB 5 billion through 13 rounds” (Volant release, 29 May 2026).

In July 2026 the company was converted into a joint-stock company, now Shanghai Volant Aviation Technology Co., Ltd. (上海沃兰特航空科技股份有限公司). The business magazine 21st Century Business Review reported the change of name and legal form on 11 July 2026, and reported that Dong said Volant would start a listing “at a suitable time” (21CBR via sfccn.com, 11 July 2026). Xinhua Finance used the new name in October 2026 (Xinhua Finance, 15 October 2026, reprinted by Volant). We found no exchange filing. Volant has not published a valuation, revenue or profit.

What they build

Volant has one product, the VE25-100, also called “天行” (Skylar). It is a piloted “lift-plus-cruise” aircraft: separate rotors lift it vertically, then a fixed wing carries it in forward flight. According to the company it has a wingspan of 16 metres, six seats including the pilot, a maximum take-off weight of 2,500 kg, a payload of 500 kg, a range of 200–400 km and a cruising speed of 235 km/h. The company notes that these figures are “for reference only” (Volant).

The certification steps all come from Volant’s own timeline. The company says the East China Regional Administration of the Civil Aviation Administration of China (CAAC) accepted the type-certificate application in September 2023. The first certification review meeting followed on 23 October 2024 (Volant, 24 October 2024), and the certification basis was agreed in April 2025. The first development aircraft, AC101, was rolled out in Zigong in May 2025 and flew with a test pilot on board between 4 and 14 October 2025 (Volant, 14 October 2025). On 28 May 2026 it completed the first piloted transition from vertical to wing-borne flight (Volant, 28 May 2026). The certification prototype AC102 was rolled out in August 2026 and made its first piloted flight in November 2026, the company says (company timeline). We found no CAAC document on the programme.

The AI link is limited. Volant says it developed its flight control, avionics and battery management systems itself (Volant, 26 August 2025). The VE25-100 is flown by a pilot. The company has announced no autonomous flight function and no AI model. In an undated interview answer on its website, Huang said AI could speed up aircraft design and production and that Volant was planning a research institute and an “X division” to make eVTOLs more intelligent (Volant FAQ). We found no later announcement of either.

Key numbers

  • Founded June 2021, Shanghai; joint-stock company since July 2026
  • Funding More than RMB 5 billion in 13 rounds, the company says (May 2026); latest: Series C of more than $300 million (April 2026) and Series C+ of nearly RMB 1 billion (May 2026)
  • Orders More than 2,000 letters of intent and firm orders worth more than RMB 50 billion, the company says, without giving the firm share; deposits of about RMB 100 million
  • Firm orders named by the company China Southern Airlines General Aviation, Asian Express, ABC Financial Leasing (10 firm, 110 intent), Beijing E-Town Financial Leasing, Zigong’s state investment company, Sichuan Airlines’ low-altitude unit (20 firm, 30 intent)
  • Certification CAAC application accepted September 2023; no type certificate yet; target 2027
  • Capacity 300 aircraft a year at Zigong, the company says; only prototypes built so far

The sources for these figures: the company’s About page (order total), ABC Financial Leasing order, 26 August 2025, Sichuan order, 15 October 2026 (ch-aviation), firm-order customers and deposits (Volant, 15 October 2026) and funding total and certification target from the company’s release of 29 May 2026. The company calls its largest export deal a record for Chinese passenger eVTOLs: a three-way agreement signed in July 2025 with Thailand’s Pan Pacific and AVIC International Engineering for 500 aircraft, valued at $1.75 billion and intended for Thailand and the Maldives (Volant, 23 July 2025).

The European angle

  • Order At the China International Import Expo in Shanghai on 6 November 2025, Volant signed agreements with seven companies, including orders for 95 aircraft worth RMB 2.375 billion. One of them was “欧洲DC Aviation” (DC Aviation of Europe), listed as an operator, reported the financial news service Cailian Press (CLS, 6 November 2025). The Paper reported that Volant, Dubai’s IC Leasing and the German business-aviation operator DC Aviation jointly signed a purchase order and a strategic cooperation agreement for 30 VE25-100 (The Paper via ifeng.com, 10 November 2025). Volant’s release of 29 May 2026 calls it “a joint order” with “Dubai’s IC Leasing and Germany’s DC Aviation for 30 aircraft” (Volant release). None of these sources says how many aircraft are for DC Aviation. We found no statement on the deal from DC Aviation, on its website or elsewhere (checked 28 November 2026). The order is for an aircraft that is not yet certified; nothing has been delivered.
  • Presence We found no European subsidiary, office, plant or test flight. Volant speaks of a “Southeast Asia – Middle East – Europe” market network (Volant release, 29 May 2026), but names no European partner other than DC Aviation.
  • Certification in Europe We found no application or other step with the European Union Aviation Safety Agency (EASA). The only certification process the company reports is the Chinese one.
  • Lists Our check on 28 November 2026 found no entry for Volant on the EU consolidated financial sanctions list, the US Consolidated Screening List (including the Entity List) or the US Department of Defense’s Section 1260H list.
  • What a European buyer would actually encounter A Chinese aircraft that is still in certification and is sold through orders and letters of intent, with no local organisation in Europe yet.

What we could not verify

  • The DC Aviation order: how many aircraft it covers, its terms, and whether it is firm or an intent order.
  • The certification steps from the regulator’s side; all dates come from Volant. We found no CAAC publication on the VE25-100 (searched 28 November 2026).
  • Valuation, revenue and staff numbers, which Volant does not publish.
  • Whether the planned AI research institute and “X division” exist.

The open question for Europe: will the first DC Aviation order lead to an EASA application, and when?

Volant Aerotech website

China AI, Plainly Explained

China AI Weekly

Every Sunday in your inbox — with a free guide to start.

What happened in China’s AI industry this week, and what it means for Europe. New subscribers get our guide China AI, Plainly Explained straight away: nine pages on what Chinese models can do, what they cost and what to watch out for.

Subscribe — it’s free

Comments are closed